Skip to content
This is the public Tradie Safety Hub help centre — no login required. Already a customer? Log in to the app →

Reusing an Existing SWMS

When starting a new job that is similar to work you’ve done before, you can duplicate an existing approved SWMS rather than starting from scratch. If the previous SWMS came from outside Tradie Safety Hub (for example, a subcontractor’s own PDF), upload it to Evidence instead and extract its hazards and controls. This copies the identified tasks, High Risk Construction Work (HRCW) categories, hazards, and controls into a new draft.

To create a new SWMS from a previous one:

  1. Click Create SWMS from the navigation menu or dashboard.
  2. Select the Duplicate Existing option from the creation methods.
  3. You will see a list of your organisation’s approved SWMS. You can use the search bar to find a specific SWMS by its title or site location.
  4. Select the SWMS you want to copy.
  5. A confirmation card will appear. You must check the box to confirm: “I confirm the tasks, hazards, and site conditions on this previous job match my current work.”
  6. Click Duplicate SWMS.

This will generate a new draft SWMS. The original approved SWMS will not be modified.

When you duplicate a SWMS, the following information is copied into your new draft:

  • The SWMS title
  • Work steps and tasks
  • Identified hazards
  • Selected controls and PPE requirements
  • High Risk Construction Work (HRCW) categories

You will need to assign the new site location, review the emergency plan, and collect new worker sign-offs for the duplicated SWMS.