Glossary of Terms
Plain-English definitions of the terms you’ll see throughout Tradie Safety Hub — where they come from legally, and what they mean for the app.
How citations work on this page: “WHS Act” means the Work Health and Safety Act in NSW or Queensland, and “WHS Regulation” means that state’s Work Health and Safety Regulation. The numbers cited here were checked against the Queensland text; both states follow the national model laws, so the core provisions cited normally carry the same numbers in NSW. Check the NSW instrument itself before relying on a specific number there. “Code” means an approved Code of Practice under WHS Act s.274 — mainly the Construction work Code. Under WHS Act s.26A an approved Code is the minimum standard: a business must either follow it or manage the risk another way that gives an equal or higher standard of health and safety. That duty has applied in Queensland since 1 July 2018 and in NSW since 1 July 2026 (s.26A was checked in both states’ Acts). Several everyday site terms (Take 5, toolbox talk, pre-start, JSA) are industry names, not legal terms — no Act or Regulation uses them. Each entry says which legal duty the practice helps you meet.
Tradie Safety Hub currently covers NSW and QLD under the harmonised model Work Health and Safety (WHS) laws. If you work in Victoria, some terms below don’t apply — Victoria uses the Occupational Health and Safety Act 2004 and different thresholds/terminology (e.g. a “coordination plan” instead of a WHS management plan).
Sites, projects, jobs & organisations
Section titled “Sites, projects, jobs & organisations”The physical workplace where work is carried out — an address with its own hazards, emergency information, and site conditions. A site is permanent: it stays on your account for as long as you keep doing work there, independent of any one engagement. A project (see below) happens at a site, and a site can host many projects over time. Sites carry their own emergency management plan and site-specific conditions that feed into SWMS content (WHS Regulation, r.299 — see SWMS below). Which roles can add or edit a site is covered in Roles & Permissions. Manage sites under Site Management.
Project
Section titled “Project”A discrete engagement — a scope, a client, a timeframe — that happens at a site and groups the jobs and documents belonging to one piece of work. The site is where; the project is the overall what. A project always belongs to a site.
Keeping Site and Project separate matters once you do repeat work at the same address: if a builder finishes a renovation at a property and returns two years later for an unrelated deck build, that’s the same site but two separate projects — each with its own set of SWMS and its own document pack, so the paperwork from the first job never gets mixed into the second.
A specific work package or High Risk Construction Work (HRCW) activity — the level a SWMS actually attaches to, since a SWMS is required per HRCW activity (WHS Regulation r.291/r.299), not per whole project or site. A job always belongs to a site, and can optionally also belong to a project when one exists.
A single project often runs several jobs at once — for example, a renovation project running an electrical job and a roofing job in parallel, each a separate work package with its own crew and hazards, each needing its own SWMS. But a job doesn’t need a project to exist: a lot of work — a single callout, a standalone job for one trade — never needs a project wrapper at all. Just pick (or create) the site, name the job, and go straight to the SWMS.
A SWMS or incident can optionally be scoped to a specific job; leaving it unset means it applies to the whole site or project instead. For how to create a job and link a SWMS to it, see Linking a SWMS to a Job.
Organisation (org)
Section titled “Organisation (org)”Your company’s own account in Tradie Safety Hub. Every record — sites, projects, jobs, SWMS, team members — belongs to exactly one organisation, and no other organisation can see it. This is an account boundary, not a legal one: see PCBU below for the legal entity that carries WHS duties.
PCBU (Person Conducting a Business or Undertaking)
Section titled “PCBU (Person Conducting a Business or Undertaking)”The legal duty-holder under the WHS Act — broader than “employer,” it covers any business or undertaking, including sole traders and principal contractors (WHS Act s.5). A SWMS records the PCBU authoring it, which is legally distinct from the organisation that happens to be using Tradie Safety Hub to store it — for example, a subcontractor’s own PCBU authors their SWMS even though the head contractor’s org is the tenant reviewing it on site.
Principal contractor
Section titled “Principal contractor”The PCBU that commissions and has management/control of a construction project (WHS Regulation, r.293). A construction project is construction work costing $250,000 or more (r.292) — smaller jobs have no principal contractor under the Regulation, and no WHS management plan. Distinct from any individual subcontractor’s PCBU.
SWMS & Take 5
Section titled “SWMS & Take 5”WHS (Work Health and Safety)
Section titled “WHS (Work Health and Safety)”The legal framework covering health and safety obligations at work — the WHS Act and WHS Regulation in each state/territory. NSW and QLD run the same harmonised model laws; Victoria’s OHS Act 2004 is a separate framework (see note above).
Jurisdiction
Section titled “Jurisdiction”Which state’s WHS laws apply to the work — decided by the site’s state, because the law that applies is the law where the work is done. Your business isn’t tied to one state: if you work on a NSW site on Monday and a Queensland site on Tuesday, each SWMS follows its own site’s law. Projects and jobs take their state from their site. If a site has no state recorded, the app asks you rather than guessing. Tradie Safety Hub supports NSW and QLD only: a site in another state or territory is refused rather than silently treated as NSW or QLD, because that state runs different safety laws (Victoria’s OHS Act 2004 is the most common example — see note above). See also Harmonised laws.
HRCW (High Risk Construction Work)
Section titled “HRCW (High Risk Construction Work)”Construction work that falls into one of 18 categories listed in WHS Regulation, r.291 (e.g. work involving a risk of a fall of more than 2 metres, work on or near energised electrical installations or services, work in a confined space). A SWMS must be completed before HRCW begins — this is the trigger the app checks for and escalates a Take 5 into a full SWMS when it’s detected. Not the same as a High Risk Work licence: “High Risk Work” (Schedule 3) is about the licence a worker holds, while HRCW is about the kind of work that needs a SWMS. The app always says “High Risk Construction Work (HRCW)” for these categories, never “High Risk Work”.
SWMS (Safe Work Method Statement)
Section titled “SWMS (Safe Work Method Statement)”A legally required document for any HRCW, prepared before the work starts (WHS Regulation, r.299). It must identify the HRCW, state the hazards and risks, and describe the control measures and how they’ll be put in place, monitored and reviewed (r.299(2)). The work must then be done in line with it (r.300), a copy given to the principal contractor on a construction project (r.301), it must be reviewed and revised when controls are changed or found not to work (r.302, applying r.38), and it must be kept and available for inspection while the work is carried out (r.303). In the app, a SWMS moves through a fixed lifecycle — Draft, Under Review, Consulted, Approved, then Pending Signatures until every worker has signed (see Reviewing & Managing SWMS) — and every finalised version and signature is permanent: corrections are made by creating a new version, never by editing history. The PCBU/site/principal-contractor identity fields are mandatory because r.299 makes the SWMS the PCBU’s own document and r.301 ties it to the principal contractor.
Take 5
Section titled “Take 5”A short, individual, on-the-spot hazard check a worker does just before starting a task — five steps along the lines of “stop, look, assess, control, go.” Take 5 is an industry name, not a legal term: no Act, Regulation or Code uses it. It is a field tool for the risk-management process every PCBU must follow — identify hazards, eliminate or minimise risks using the hierarchy of control, and review controls (WHS Regulation rr.34–38) — and for the worker’s own duty to take reasonable care and follow reasonable instructions (WHS Act s.28). A Take 5 applies to any task, including work already covered by a SWMS: there it’s the moment to check the SWMS controls still fit today’s conditions (r.38(2)(c) requires review when a new hazard or risk is identified). A Take 5 never replaces a SWMS: if it uncovers work that falls into an HRCW category with no SWMS, the app escalates it to a full SWMS. See Take 5 Safety Checks. Not the same as a JSA (a written, task-step analysis) or a Daily Prestart (a crew consultation meeting).
Source labels
Section titled “Source labels”When the app shows where a recommendation or control comes from, each source is labelled with what kind of document it is:
- Duty: the Act or Regulation that sets the legal obligation, e.g. Regulation · NSW.
- Standard: the Code of Practice that the obligation is measured against, e.g. Approved Code · QLD. A Model Code is Safe Work Australia’s national template. It is shown only when no Code applies in your state, and it is not law until a state adopts it.
- Technical: a technical standard such as an AS/NZS, e.g. Australian Standard.
- Guidance: regulator guidance and other further reading.
The state after the dot is where that document applies. The label tells you whether a source sets the obligation itself or describes how to meet it.
Hierarchy of control
Section titled “Hierarchy of control”The mandatory order of preference for controlling a risk (WHS Regulation, r.36): eliminate the hazard entirely; if that’s not reasonably practicable, substitute it with something safer; then isolate people from it; then apply engineering controls; then administrative controls; and PPE last, only where risk remains. The AI SWMS generator is built to work down this hierarchy — it’s designed to add controls, not remove them, and to flag uncertainty rather than guess.
Daily Prestart (pre-start meeting / toolbox talk)
Section titled “Daily Prestart (pre-start meeting / toolbox talk)”A short check held before a shift starts, usually with the crew: the day’s work, site conditions, plant and the relevant SWMS controls are run through, and any new hazards are raised and controlled. On site the same thing goes by several names — pre-start, prestart meeting, toolbox talk or toolbox meeting. Tradie Safety Hub uses one name for all of them: Daily Prestart. In the app, a Daily Prestart records the shift start, weather, site and plant condition, any hazards with their control, and optionally the SWMS for the day’s work. It also records who attended, each attendee’s sign-off, what was discussed and any concerns the crew raised. If a toolbox talk is how you consulted workers on a SWMS, record that as the consultation method on the SWMS itself. See Daily Prestart Routines.
None of these names are legal terms, but the meeting is how many sites meet three legal duties:
- Consulting workers on hazards, risks and controls (WHS Act ss.47–49). The Construction work Code (§1.7) names toolbox talks and pre-start meetings as a way for builders and subcontractors to give workers information and get their feedback. Its best practice is to record the topic, who attended and what was raised.
- Walking workers through the SWMS before HRCW starts. The Code (§4.2) says to consult on a SWMS when it first becomes available, for example in a toolbox talk.
- Giving site-specific information and training (WHS Regulation r.39). The Code (§6.2) says a workplace-specific induction can be delivered through toolbox talks or pre-start meetings.
A Daily Prestart is a group, consultation record. A Take 5 is an individual pre-task hazard check, and a SWMS is the standing document both check against. The Daily Prestart’s keyword check can escalate to a SWMS in the same way a Take 5 can. Tradie Safety Hub doesn’t generate scripts for toolbox talks — see Toolbox talk.
Toolbox talk
Section titled “Toolbox talk”Another name for a pre-start meeting — see Daily Prestart. Recording a toolbox talk is part of Daily Prestart. Tradie Safety Hub doesn’t have a separate toolbox-talk module, and it doesn’t generate AI-written talk scripts.
JSA (Job Safety Analysis)
Section titled “JSA (Job Safety Analysis)”Also called a JHA (Job Hazard Analysis). A written, step-by-step breakdown of a task that lists each step, the hazards in it and the control for each. JSA is an industry name, not a legal term. It’s one way to document the risk-management process (WHS Regulation rr.34–38), and the right tool for non-HRCW tasks that need more than a Take 5. It isn’t a substitute for a SWMS where the work is HRCW: a SWMS has content prescribed by law (r.299(2)), and a JSA doesn’t. Some sites use the words interchangeably, and a JSA that meets every r.299(2) requirement can serve as the SWMS. In Tradie Safety Hub, record a JSA-style assessment with a Risk Assessment, and any HRCW is escalated to a SWMS.
Site induction (site-specific induction)
Section titled “Site induction (site-specific induction)”The briefing a worker or visitor gets before starting on a particular site. It covers that site’s hazards, rules, emergency procedures and amenities. It’s distinct from the one-off general construction induction — see White Card. No regulation uses the phrase “site induction”. The duty behind it is the PCBU’s obligation to provide information, training and instruction suitable to the work and the risks (WHS Act s.19(3)(f); WHS Regulation r.39). The Construction work Code (§6.2) calls it a workplace-specific induction.
On a construction project, the principal contractor’s WHS management plan must set out the site-specific health and safety rules and how people will be told about them (r.309(2)(d)). The principal contractor must, so far as reasonably practicable, make each person aware of the plan’s content before they start work (r.310). The QR site sign-in and induction module is planned for a later release, and isn’t available yet.
General construction induction (White Card)
Section titled “General construction induction (White Card)”The mandatory, one-off WHS training a person must complete before doing any construction work (WHS Regulation, Part 6.5). A PCBU must provide the training to any worker who hasn’t done it (r.316), and must not direct or allow a worker to do construction work unless they have done it and hold the card (r.317). Training done more than 2 years ago only counts if the worker has done construction work in the last 2 years (rr.316–317). The card is issued by the regulator once the training is done (rr.319–320). It’s recognised across states and called a White Card. It is not a site induction: every site still needs its own site-specific induction. Tradie Safety Hub records and verifies White Cards in the White Card Approval Ledger. A worker without a verified card isn’t blocked from Take 5 or Daily Prestart: they see a warning, and the ledger flags them to the PCBU, who carries the r.317 duty.
Emergency plan
Section titled “Emergency plan”A workplace’s written emergency procedures — how to respond effectively, evacuate, notify emergency services and give medical treatment and assistance — plus testing and information, training and instruction for workers (WHS Regulation, r.43). Every PCBU must have one, not just principal contractors. On a construction project, it is coordinated through the principal contractor’s site arrangements. The app keeps the emergency plan on the site record, so it moves with the site rather than living inside one SWMS — see Emergency Management Plans in the app.
WHS management plan
Section titled “WHS management plan”A written plan the principal contractor must prepare for a construction project of $250,000 or more, before work starts (WHS Regulation, r.309). It must cover:
- names, positions and health and safety responsibilities
- arrangements for consultation, cooperation and coordination
- arrangements for managing incidents
- site-specific health and safety rules, and how people will be informed of them
- arrangements for collecting, assessing, monitoring and reviewing SWMS
The principal contractor must make workers aware of it before they start (r.310), keep it up to date (r.311) and keep a copy until the project is completed (r.313). A subcontractor doesn’t write one. Instead, they give the principal contractor their SWMS before HRCW starts (r.301), and the principal contractor must take reasonable steps to get it (r.312). Victoria’s version is a “coordination plan” under a different law. The WHS management plan module is planned for a later release, and isn’t available yet.
Guest signer
Section titled “Guest signer”Someone who signs a SWMS or attendance record without holding a full user account (e.g. a visiting subcontractor’s worker). The guest signer flow captures their identity, intent, and consent, and stores that capture immutably alongside the signature — the same non-negotiable applied to every other SWMS signature. See Worker Acknowledgement.
Audit log / audit trail
Section titled “Audit log / audit trail”An append-only, tamper-evident record of who did what and when to a SWMS or safety record. Audit events are hash-chained so a gap or edit is detectable; nothing in this trail can be updated or deleted, even by an admin — enforced at the database level, not just hidden in the UI.
Roles & access
Section titled “Roles & access”The access level a person has in your organisation — it decides what they can see and do in the app. Your own team members are an Owner, Admin, Safety Manager, Supervisor, Worker or Subcontractor. Two further roles, Government Inspector and WHS Permit Holder, are read-only access for people outside your organisation with a legal right to review your records. What each role can do, how the two outside roles differ legally, and how to widen a role’s access are all explained in one place: Roles & Permissions.
Not the same as a job role (a trade title such as “Crane Operator” assigned to a SWMS work step) — see Job Roles.
Regulator
Section titled “Regulator”The government body responsible for administering WHS law in a state — SafeWork NSW or Workplace Health and Safety Queensland (WHSQ) for the two jurisdictions Tradie Safety Hub covers (WHSQ publishes as WorkSafe Queensland, at worksafe.qld.gov.au). Safe Work Australia writes the national model laws but isn’t a regulator. Government inspectors are appointed by the regulator (see Roles & Permissions), and a notifiable incident is reported to it (WHS Act s.38).
Laws, Codes & Standards
Section titled “Laws, Codes & Standards”Safety documents get quoted at you constantly — “the Act”, “the Regs”, “the Code”, “AS 1576”. They aren’t all the same kind of thing, and they don’t all carry the same weight. This section explains each one and why it matters for your SWMS. The source labels the app shows next to a recommendation use the same groupings.
Legislation
Section titled “Legislation”The umbrella word for law: the Acts passed by Parliament and the Regulations made under them. Codes of Practice, Australian Standards and guides are not legislation, even though they’re often quoted alongside it. Why it matters to your SWMS: when a site manager says “that’s a legislative requirement”, it should point to an Act or Regulation. If it points to a Code or a guide, it means something different (see below).
The main law, passed by Parliament — for WHS, the Work Health and Safety Act 2011 in NSW and the Work Health and Safety Act 2011 in Queensland (two separate Acts with the same name). The Act sets the big duties, such as a PCBU’s duty to keep workers safe so far as is reasonably practicable, and creates the offences. Act provisions are called sections, written “s.” (e.g. s.19). Why it matters to your SWMS: the Act is where your duty comes from. A SWMS is how you show you’ve met it for high risk construction work.
Regulation
Section titled “Regulation”The detailed rules made under an Act. It has the force of law, but it can only cover what the Act allows. For WHS that’s the Work Health and Safety Regulation 2025 in NSW and the Work Health and Safety Regulation 2011 in Queensland. This is where the SWMS rules live: what counts as HRCW (r.291) and what a SWMS must contain (r.299). Why it matters to your SWMS: most of the specific “you must” requirements a Tier 1 reviewer checks come from the Regulation.
Section, regulation and clause numbers
Section titled “Section, regulation and clause numbers”How a law’s provisions are numbered and written:
- s. (section) — provisions of an Act, e.g. WHS Act s.26A. The NSW WHS Regulation 2025 also numbers its provisions as sections, so in NSW you’ll see “s.291” for the HRCW list.
- r. (regulation) — provisions of the Queensland WHS Regulation, e.g. r.291. This glossary uses “r.” as the general form.
- cl. (clause) — the older NSW 2017 Regulation and some other Regulations. “cl.291” on a NSW document is the old numbering.
- § — a section of a Code of Practice or guide, e.g. Construction work Code §4.2. A § number is not a law reference.
Why it matters to your SWMS: a SWMS that cites “cl.” for NSW work may look out of date to a reviewer. The app shows each document’s own numbering.
Approved Code of Practice
Section titled “Approved Code of Practice”A practical guide to meeting a duty, approved by the state’s WHS Minister (WHS Act s.274). In NSW and Queensland, an approved Code sets the minimum standard (WHS Act s.26A): you must either follow it, or manage the risk another way that gives the same or a higher standard of health and safety. A court can also use it as evidence of what was reasonably practicable (s.275). An approved Code is not itself law — its weight comes from the Act — and each state approves its own list, so a Code approved in Queensland isn’t automatically approved in NSW. Why it matters to your SWMS: if a Code covers your task, your controls should meet it or do better. Doing it differently is allowed, as long as your way is at least as safe — and your SWMS should say how.
Model Code and model laws
Section titled “Model Code and model laws”Safe Work Australia writes model WHS laws and model Codes of Practice as national templates. They aren’t law anywhere on their own — each state decides whether to adopt them, and may change the wording when it does. Safe Work Australia isn’t a regulator and doesn’t enforce anything. Why it matters to your SWMS: quote your state’s approved version where there is one. The app shows a model Code only when no approved Code covers the topic in your state, and labels it Model Code.
Harmonised laws and model laws
Section titled “Harmonised laws and model laws”NSW and Queensland both adopted the model WHS laws, so their Acts and Regulations are harmonised: the same duties, the same thresholds and mostly the same numbers. Harmonised doesn’t mean identical — each state has its own Regulation (NSW 2025, Queensland 2011), its own list of approved Codes, and its own dates for when changes start. Victoria didn’t adopt the model laws and runs its own OHS Act 2004. Why it matters to your SWMS: a SWMS written for a Queensland site can’t just be relabelled for a NSW site — check the citations and Codes for the new site’s state.
Guidance material
Section titled “Guidance material”Guides, fact sheets, information sheets and web pages published by a regulator or Safe Work Australia. They explain how to do something, but they have no legal force of their own. Why it matters to your SWMS: guidance is useful for ideas and good practice, but don’t present it as a legal requirement. The app labels it Guidance.
Australian Standard (AS, AS/NZS)
Section titled “Australian Standard (AS, AS/NZS)”A technical standard published by Standards Australia (some jointly with New Zealand), e.g. for scaffolding, ladders or electrical wiring. A Standard is not law by itself. It becomes binding only when a law calls it up (refers to it as something you must comply with). When a WHS Regulation calls up a Standard, it’s usually the edition that was current when the Regulation referred to it, not automatically the newest one; some other laws, such as electrical and plumbing laws, do pick up the latest edition. A Code of Practice mentioning a Standard doesn’t, on its own, make it law. Why it matters to your SWMS: quoting a Standard shows the technical basis for a control. Your equipment or work often has to meet it under contract or site rules anyway — but say “as per AS …”, not “required by law”, unless a law calls it up.
Gazette notice and ministerial instrument
Section titled “Gazette notice and ministerial instrument”The formal paperwork that approves, changes (varies) or withdraws a Code of Practice. In NSW, Code approvals are published in the NSW Government Gazette. In Queensland, approved Codes are listed in a Codes of Practice notice, and changes are made by a numbered ministerial instrument (for example, the 2026 changes to several Queensland Codes). Why it matters to your SWMS: these set the date a Code version starts to apply. A SWMS keeps the version of the reference information that was current when it was made.
Commencement, in force, repealed and superseded
Section titled “Commencement, in force, repealed and superseded”- Commencement — the date a law or Code version starts to apply. A law can be published before it commences.
- In force — it has commenced and hasn’t been repealed.
- Repealed (a law) or revoked (a Code approval) — removed, so it no longer applies.
- Superseded — replaced by a newer version, e.g. the NSW WHS Regulation 2017 was replaced by the 2025 Regulation.
Why it matters to your SWMS: a SWMS should cite what’s in force on the day the work is done. Tradie Safety Hub keeps a signed SWMS exactly as it was — it doesn’t rewrite old SWMS when a law changes. Create a new version if the work continues under the new rules.
High Risk Work licence
Section titled “High Risk Work licence”A licence a person must hold to do certain work or operate certain plant, such as scaffolding, rigging, dogging, cranes and forklifts (WHS Regulation Part 4.5, with the licence classes in Schedule 3). It’s issued by the regulator. Not the same as HRCW: HRCW is a kind of work that needs a SWMS; a High Risk Work licence is a qualification a worker holds. Some work needs both — the SWMS for the job, and a licensed worker to do it. Why it matters to your SWMS: where a task needs a licence, the SWMS should say so and the worker doing it should hold the right class. Track licences in the Training Register.
Requirement type
Section titled “Requirement type”Behind the scenes, Tradie Safety Hub records how strongly it can say each recommended control is required. Most are reference controls: good practice drawn from a real, cited source, without the app claiming the control’s exact wording is the law. Others come from a model Code (no legal force), from your principal contractor’s own project or site rules, or from the AI with no source. The app never describes a control as a legal requirement unless that has been specifically established — which is why recommendations are worded as good practice and point you to their citation. Why it matters to your SWMS: a control described as good practice still deserves your judgement. How strong its source is tells you how much weight it carries, not whether you can skip it.
Citation
Section titled “Citation”The reference shown next to a control or recommendation that says where it comes from: the document (e.g. Managing the risk of falls at workplaces Code), the state it applies in, and the part (e.g. §4.2 or r.78). Each citation carries a source label — Duty, Standard, Technical or Guidance. Why it matters to your SWMS: citations let a reviewer check your controls against the source. If a citation is from another state or is only guidance, the label says so.
Permits, credentials & incident reporting
Section titled “Permits, credentials & incident reporting”Permit register
Section titled “Permit register”A dedicated record for one specific activity — confined space entry, excavation, or hot work — that documents the formal authorisation, risk assessment, and sign-off needed before that activity starts, on top of the SWMS covering the broader job. Only one of these permits is required by law: the confined space entry permit (r.67). Work in or near a confined space is HRCW (r.291(f)). So is work in or near a shaft or trench deeper than 1.5 m, or a tunnel (r.291(g)), but no regulation requires an excavation permit. Hot work isn’t HRCW, and a hot-work permit is good practice, not a legal requirement. A permit-to-work system is an administrative control in the hierarchy of control. It sits on top of the SWMS, and never replaces it. Permit registers are planned for a later release, and aren’t available yet.
Confined space entry permit
Section titled “Confined space entry permit”The only permit to work the WHS Regulation requires by name. Before a worker enters a confined space, the PCBU must issue a written entry permit (r.67). It must be completed by a competent person, and state:
- the confined space
- the names of the workers permitted to enter
- the period the work is permitted
- the risk controls — based on a confined space risk assessment (r.66), and including the controls for safe entry and the system of work (r.69)
It must also have space to record that the work is complete and everyone has left. The permit must be kept at least until the work is complete. If a notifiable incident happens, it must be kept for at least 2 years after the incident (r.77). Work in or near a confined space is also HRCW (r.291(f)), so it needs a SWMS as well. The permit authorises a specific entry, and the SWMS covers the overall work method. See Confined Space Permits.
Credential Vault
Section titled “Credential Vault”A central record of a worker’s licences and certifications (e.g. High Risk Work licences) with tracked expiry dates — distinct from the White Card Approval Ledger described in Managing Credentials, which reviews and verifies general construction induction (White Card) credentials specifically. The Credential Vault isn’t available yet.
Incident report
Section titled “Incident report”A formal record of a notifiable workplace incident prepared for submission to the WHS regulator (WHS Act s.38) — distinct from a Take 5 or Daily Prestart, which are routine reviews done before work starts rather than records of something that already happened.
Subscription & product terms
Section titled “Subscription & product terms”Your organisation’s subscription plan — Starter (free), Pro or Business — which gates access to AI-assisted features like SWMS generation and hazard-image detection. See Billing & Subscription.
AI hazard detection
Section titled “AI hazard detection”An assistive, non-exhaustive suggestion feature — it proposes possible hazards it sees in a photo for a human to review, never an autonomous “spots your hazards for you” system, and never final on its own. See Creating a SWMS and Using the AI Assistant.
This glossary explains app terminology in plain English and is not legal advice. Definitions are underpinned by the harmonised WHS Act and WHS Regulation as adopted in NSW and QLD; always check the current legislation for your jurisdiction.