Skip to content
This is the public Tradie Safety Hub help centre — no login required. Already a customer? Log in to the app →

Creating a SWMS

Creating a SWMS guides you step-by-step to identify hazards, determine High Risk Construction Work (HRCW), and assign appropriate controls. Start from SWMS in the app (in the menu under Documents).

If you already have a SWMS draft on the go, the What are you working on today? screen shows a Resume draft button. Tap it to reopen that draft in the editor and carry on, or describe a new job below it to start a new SWMS. Your draft stays saved either way.

If you switch to another app, or your phone reloads the page while you’re setting up a new SWMS, you come back to the same screen with what you’d entered still there: the site and work description, the hazards and controls you ticked, and, once the AI has drafted, the review screen. This is kept for the current browser tab only, and it’s cleared when you send the SWMS on, open it in the editor, or sign out.

When creating or editing a SWMS, the editor guides you through several dedicated steps:

On tablet and desktop devices, the SWMS Editor provides a side menu. This allows you to quickly jump between different sections of the SWMS (such as Scope, Hazards, Controls, and Review) at any time.

Before you can start describing the work, you’re asked to confirm the site the SWMS is for and give a short summary of the work. Both are marked as required. These two details are used straight away to look up the hazards, controls and PPE that are typically needed for that kind of job, so you can confirm or adjust them before you go any further — rather than being asked to describe everything again from scratch once you reach the chat or voice assistant. Nothing is pre-selected: each hazard, control and PPE item is shown as a button you can tap, and you tap the ones that apply to include them. Hazard and PPE buttons show their official ISO 7010 safety icon next to the name, for the same quick visual recognition on site as the Controls step.

Once you pick a site, its Site details appear underneath: the address, work area, project or job number, principal contractor, site manager and supervisor, and the site’s emergency information. These are the details your SWMS will carry, so check them against your site induction before you continue. Anything the site doesn’t have yet says Not provided yet. If you’re allowed to manage sites, tap Edit site details to fix or add them without leaving the SWMS. Otherwise, ask an admin to update the site in Site Management. If the site has no emergency information yet, you’re warned straight away: you can still start the SWMS, but it can’t be approved or signed off until that information is recorded.

Your description is used exactly as you wrote or said it: it is what appears in your SWMS as the work description, and the app doesn’t reword it. The hazards, controls and PPE for the job come up straight away.

The suggestions are based on what your job description actually says. Categories that only might apply to your trade, such as confined spaces for a plumber, appear folded away under Might apply to this kind of work. Open that section if any of them fit this job. For example, a rigger may see Structural Alterations there: erecting structural steel means keeping the part-built frame braced and stable, and in Queensland its controls come from the Steel construction Code of Practice 2004.

Start by picking the hazards that apply. The controls for each hazard then appear below it, so you only see the controls for the hazards you picked. Every control usual for that kind of work is also folded away under All recommended controls, whichever hazards you picked, and you can open that section and tap any that apply to this job. Each control is written in plain English. Tap the ⓘ beside a control to see its full wording (when it has a plain-English summary) and its source, each labelled by what it is: Duty is the law that creates the obligation, Standard is the Code of Practice it is measured against, Technical is a technical standard such as an AS/NZS, and Guidance is further reading. Tap the ⓘ beside a hazard to see what it means and when it applies. For example, Falling from height covers anything from a step ladder to a roof edge, and a fall of more than 2 m makes the job high-risk construction work. If a hazard you pick has no standard control listed yet, the screen says so. Tell the chat how you’ll control it on this job.

Some PPE is only needed for some jobs. For example, insulated gloves, arc-rated clothing and an arc-rated face shield are for live electrical work, testing, or high-voltage work. When the app can’t yet tell whether your job needs an item like this, it still shows it, marked confirm it applies. Tap the ⓘ to see when it isn’t needed, and only tap the item if it applies to this job.

On the same screen you can:

  • Tap Add your own control under Your own controls to write a control that isn’t listed, for example Spotter on the ground at all times. Tap Add and the app suggests cleaner wording where it can. Choose Use suggestion or Keep mine. You can add as many as you need, and tap the pencil beside one to edit it afterwards. A control only counts once you’ve added it and settled its wording. Your own controls carry through to the SWMS along with the hazards and controls you picked.
  • Tap Chat with AI to open the AI chat beside the suggestions, so you can talk it through before you continue.
  • Use Any site-specific information? to type anything particular to your site, or tap Upload site documents to add documents you already have, like a site pack, site rules or permits. The AI reads them and shows what it found as buttons. Tap the ones that apply; nothing is included until you do. Text from your documents is only ever used as information about the site. The AI doesn’t follow it as instructions. If a document’s wording is cut short or unclear, that item is flagged for you to check before it can be used.
  • Tap Change site or job at any time during intake to go back and adjust the site, job or work summary.

If you chose AI Draft, tapping Continue after the suggestions takes you to your SWMS with the AI chat open beside it. What you picked already shows in the document as AI draft and is sent to the chat, so it can carry on from there. At the top of the chat, a Using your picks card shows how many hazards, controls and PPE items you chose. Tap Show list to see them all. Nothing you picked is in your SWMS until you review it. If you chose Start Blank instead, there’s no chat: your picks fill in the SWMS for you, and you finish it yourself and save. If no typical hazards are found for your description, you go straight here too, with your summary already sent.

While you chat, your SWMS is shown as a read-only document that fills in as you answer. When the AI has everything it needs, it tells you your draft is in the SWMS and shows a Review in Edit button that opens the section to check first. Accept or reject each item the AI drafted, then save. To change something, tap Keep chatting to change something. Anything the AI has drafted is marked AI draft, and whatever was just added is highlighted as New. Nothing drafted by the AI is in your SWMS yet. On a phone, the chat comes first and the document sits below it.

If the AI sends back a draft with steps that have no hazards, or hazards with no controls, the app tells you which steps are affected and adds nothing to your SWMS. Tap Try again to ask the AI to redo it, or Review it anyway to open what it sent and fill in the gaps yourself.

Tap the minimise button (−) to tuck the chat away and give the document the whole screen; tap AI chat to bring it back exactly where you left off. On a tablet or computer, the pin button switches the chat between sitting beside your SWMS and floating over the page. To make the chat wider or narrower, drag its left edge (or focus the edge and use the left and right arrow keys). The width you choose is remembered on that device.

If you switch to another app, lose your signal, or the screen turns off while the AI is replying, you don’t lose the answer. When you come back, or close the chat and open it again, the reply is there. If the page has to reload, the chat picks up where it was. While the AI is still working on a reply, the chat says Still working…, which means your answer is on its way, so you don’t need to send it again. If it says it took too long, tap Try again. What you typed is kept, so you won’t have to write it out again. Photo and voice results you haven’t accepted yet are kept the same way until you accept or discard them.

Use the View / Edit switch at the top to change the document whenever you like. When the AI has finished, tap Review in Edit and accept or reject each work step, hazard and control it drafted, one at a time, then save. You still need to send the SWMS for review before it can be used. A SWMS that has been submitted, approved or signed can’t be switched to Edit; create a new version instead. Change site or job opens the site and location details in Edit.

The state your SWMS is written against — its jurisdiction, which sets the correct regulator and legislation to cite — is set automatically, so you’re never asked to choose it yourself. It comes from the site you pick, or from your organisation’s jurisdiction if the site has no state recorded. A site in a state Tradie Safety Hub doesn’t cover yet, such as Victoria, is refused rather than treated as NSW or QLD. You can’t continue past the site and work summary step until the site’s state is set to a state we cover. If it isn’t, you’re told why next to the site field. To add or correct a site’s state, open it in Site Management.

If your site has more than one job on the go, you can also pick which job this SWMS belongs to — this is optional, and you can create a new job right there. See Linking a SWMS to a Job. When you do pick a job, its title and description help the AI tailor the draft to that specific piece of work — they’re background only, so what you type about the actual work always takes priority.

If you select Continue before filling in a required field, the app tells you exactly which one is missing so you can fix it — it won’t leave you guessing why nothing happened.

Once that’s done, you can describe the work in several ways to get started quickly:

  • Text/Chat: Describe the task and let the AI extract potential hazards.
  • Voice: In the AI chat, tap Talk it through and describe the job out loud; tap Stop when you’re done. You’ll see the words the app heard, so you can fix anything it got wrong, then tap Send to chat. The button stays there at every step of the chat, so you can answer any question by talking. If what you said isn’t enough to draft from yet, the app still shows your words and the chat asks you about the rest. If you started from a previous SWMS of yours, the screen with your words says it’s being used, so you can check what the chat brings over from it. Talk it through is part of the Pro plan; on any plan you can also tap the microphone next to the message box to speak a short answer. If your browser has blocked microphone access, the app says so and tells you to allow it for this site in your browser settings. You can type in the chat in the meantime. The recording is used only to write out what you said. It is deleted automatically within about a day of being uploaded, and the written-out text stays in your chat.
  • Vision: In the AI chat, tap Site photo and take or pick a photo of the worksite. The AI suggests some possible hazards it can see in the frame (AI hazard detection). It’s a starting point, not a full hazard check: a photo can miss things and the AI can get things wrong, so check the site yourself and add anything the photo doesn’t show. Tap ✕ to dismiss any suggestion that doesn’t apply, then tap Ask the chat to add these. The chat adds them to your SWMS as AI drafts, and nothing is in your SWMS until you accept each one.

Your draft is named from what you’ve already given: the site’s name, a short description of the job, the site address and your work area, for example Queen’s Wharf Development - Install formwork - 23 Wharf St, Brisbane City QLD 4000 - Level 3, North Tower. A SWMS has to be specific to the site, so the AI chat asks you to confirm the name or correct it, such as adding the builder’s project name, a lot number and estate on a new estate, or the level and building you’re working on. The app can also suggest a title from the linked job or from your initial description. You can change this suggested title at any time before you send the SWMS for review; once you’ve edited it yourself, the app stops updating it, so your wording sticks.

Every SWMS must carry a valid 11-digit Australian Business Number (ABN) for the business preparing it, and you can’t send it for review without one. New SWMS documents start with your organisation’s ABN, which is required when you set up your business (owners and admins of older businesses with none see an Add your ABN prompt on the dashboard). If yours is blank, or belongs to a different business, enter it in the Your ABN box on the Overview section. You can type it with or without spaces (for example, 51 824 753 556); extra spaces around it are ignored. The app checks the number as you type and tells you if it isn’t a valid ABN.

Your draft saves a few seconds after you stop typing, and whenever you tap Save. It saves however incomplete it is, so you never lose work part-way through. The one exception: after you accept changes from the AI, the app waits for you to tap Save rather than saving them on its own.

The checklist in the editor shows what’s still needed, including AI-flagged hazards checked when your SWMS has hazards the AI flagged for review. Submit for Review stays unavailable until everything on the checklist is done.

When you tap Submit for Review, the app then checks the whole SWMS before sending it. If anything required is still missing, nothing is sent, and a box at the top of the editor lists each item with a Go to link that opens the section where you fix it. Items include the ABN, at least one High Risk Construction Work (HRCW) category (only asked for when the SWMS is for high-risk construction work, not for a voluntary SWMS on other work), a responsible role on each step, a risk rating for each hazard, and the control details described below (also not needed for a voluntary SWMS). The same check runs when you tap Send to Manager for Review in the guided create flow: if anything is missing, your draft is kept and the missing items are listed, so open the draft in the editor to finish them. Worker consultation isn’t needed to submit: it’s recorded during review, and the SWMS can’t be approved until it is (see Reviewing & Managing SWMS).

The SWMS must break down the job into sequential work steps. If you’ve provided enough job details (like a title and a scope of work), the AI can proactively generate a draft list of starter steps for you. Simply click Generate starter steps when prompted.

If you haven’t provided enough job details yet, clicking Generate starter steps opens a short prompt asking for a title and a brief scope of work first. Once you save those details, click Generate starter steps again to create your draft steps.

If you see “That text can’t be sent to the AI assistant”, the title or scope has something in it that isn’t a job description, such as pasted computer code or a password. Describe the job in your own words and try again.

The AI will provide realistic operational steps (including required tools and roles) based on the context you’ve provided and WHS standards. It will also generate likely Hazards and consequences for each step based on the work being performed.

The AI writes these steps for the WHS laws of the state the work is in (NSW or QLD), which the app takes from your site or organisation details. If it doesn’t know the state yet, it won’t guess. If the AI can’t write steps for your job, for that reason or any other, no steps are added. You’ll see a message saying so. Tap Add Work Step to write your steps yourself, or tap Try again. The app never fills your SWMS with example steps that weren’t written for your job.

Reviewing AI Suggestions:

  • AI-suggested steps are visually highlighted with a distinct border, background color, and a ”✦ AI SUGGESTION” badge so you can easily tell what was system-generated versus human-verified.
  • You must review each AI suggestion to ensure it accurately reflects your specific site and job.
  • Click Accept Suggestion to verify the step, or simply start editing any field within the step to automatically mark it as accepted. Once accepted, the AI highlight is removed.

You can also ask the AI Assistant (e.g., “Suggest some work steps for this job”) to generate or refine these work steps for you conversationally. You must always review, edit, or add manual steps to ensure they are accurate.

In the Hazard Identification step, you must first build a comprehensive list of the hazards present for the task before you assign safety controls. This ensures all risks are captured before moving on to mitigation.

Hazards flagged for review. Some hazards the AI suggests are marked Needs review, including every hazard in AI-suggested starter steps. Read the hazard and its controls, then tap I’ve checked this. The app records who checked it and when, and the hazard shows Checked. Each work step shows how many of its hazards still need review, even when the step is collapsed.

  • If you then change the hazard, its risk ratings, who’s exposed, or any of its controls, the Checked mark is removed and you need to check it again. Filling in More control details doesn’t remove it.
  • You can tap I’ve checked this in the creation wizard as well as in the SWMS editor. A hazard you check in the wizard is still checked when you open the SWMS in the editor.
  • You can’t submit the SWMS for review until every flagged hazard is checked, and a SWMS can’t be approved while one isn’t. A reviewer who finds one sees it listed by step, and requests changes so you can check it.

The Supporting Evidence step lets you list the tickets, licences, or competencies required for the work (e.g. a High Risk Work Licence for forklift operation), and attach the documents that back them up — Safety Data Sheets (SDS), copies of tickets, or licences. Attached files and listed licences appear together as a Supporting Evidence section on the exported PDF, giving a reviewer at the gate everything they need in one place rather than chasing separate paperwork.

Once your hazards are identified, you proceed to the Controls step to select the appropriate mitigation measures and High Risk Construction Work (HRCW) categories.

Smart Defaults:

  • Auto-populated PPE: The system automatically suggests and populates baseline Personal Protective Equipment (PPE) controls based on the identified hazards. PPE items are displayed alongside their official ISO 7010 safety icons for quick visual recognition on site.
  • Conditionally-required Permits: If you select hazards or tasks that typically require a high-risk work permit (e.g., Hot Work, Confined Space), the system will automatically surface those permit requirements in the UI. Permits are presented using AS 1319 color-coded chips (e.g., red for Danger, yellow for Warning, blue for Info) to clearly indicate the level of risk associated with the permit.

The system validates that you have selected a valid control type for each hazard — one of the six levels of the hierarchy of control, from Elimination down to PPE.

Say how each control will be carried out. For high risk construction work, a SWMS has to describe how each control will be put in place, monitored and reviewed (WHS Regulation, r.299(2)). Under every control, More control details holds four fields: Responsible person, Implementation timing, Verification method and Review trigger. For high risk construction work, all four are marked as required with an asterisk (*), and any control that hasn’t answered them is flagged so you can see what is missing before you save. Answer them specifically for the job, for example Site Supervisor, Before any roof access, each shift, Visual inspection and handover sign-off and After any change to the exclusion zone. Entries such as “All workers”, “TBD” or “as required” don’t count, because they don’t say who does what or when.

A control that still needs these answers shows a Needs detail tag. Its details open on their own and any empty field says Required. Each work step also shows how many of its controls still need detail, even when the step is collapsed. A SWMS that isn’t for high risk construction work doesn’t require these four fields.

Codes of Practice: Suggested controls come with the approved Codes of Practice for your state that apply to the work — for example Tower cranes for crane work in NSW, or Managing the risk of falls at workplaces for work at height. An approved Code is the minimum standard for that work: you follow it, or manage the risk another way that’s equally safe or safer (see the note at the top of the glossary). Sometimes a Code is listed as “Also check” (for example Managing the work environment and facilities for work in extreme heat or cold) — it applies to your job, but the suggested controls weren’t drawn from it, so check the Code itself for anything specific to your work before you sign. Tree work in New South Wales is a partial case: the suggested controls cover climbing, elevated work platforms, crane access and rescue from the Tree works Code, but not felling, chainsaws, woodchippers or stump grinders, so read that Code for those before you sign. If your job description mentions treated timber (for example treated pine posts, decking or sleepers), the suggested controls for handling and cutting it are added to your suggestions in New South Wales and Queensland, even though treated timber is not a high-risk construction work category and won’t be added to your SWMS as one. In New South Wales they are drawn from the Safe handling of timber preservatives and recently treated timber Code; the running of an industrial treatment plant is not covered.

Rules that differ by state: where New South Wales and Queensland set different figures or rules for the same control, you only see your job’s state. For example, a tower crane’s capacity limiter shows the figure for your state’s Code and nothing from the other. Some controls come from only one state’s Code. In the other state they’re still suggested, and their source shows the other state’s Code, so you can use them but shouldn’t present them as a rule your own state’s inspector will apply. Concrete pumping controls are the main example in New South Wales, which has no concrete pumping Code.

The Completion Assistant reviews your draft SWMS and asks targeted follow-up questions to ensure you haven’t missed critical details (like specific heights, depths, or voltages).

For each question, you can:

  • Use Quick Answers: Tap the suggested quick-answer buttons to instantly add common details to your answer.
  • Add All: Use the “Add all” button to apply all the suggested quick answers at once. The system automatically avoids adding duplicates if you’ve already included some of them.
  • Add Custom Detail: Type or use the “Speak” button to provide specific details not covered by the quick answers.
  • Dismiss Questions: If a question isn’t relevant to your specific job, you can dismiss it by clicking the ‘X’. Dismissed questions are crossed out, but you can always restore them later if you change your mind.

Once you’re satisfied with your answers, click Apply answers to draft to update the SWMS with your responses.

Emergency procedures are a critical component of a SWMS. Instead of duplicating emergency information across every SWMS, the application automatically pulls the emergency plan details (such as assembly points, emergency contacts, and procedures) directly from the associated Site — manage them in Emergency Management Plans.

  • Required before approval: A SWMS can’t be approved until its site has emergency information recorded. Until then, the Emergency Plan section of the SWMS shows as not started, so you can see what’s missing before you send it for review. Anyone who can edit the site can record it: an owner, admin or safety manager, or a role your admin has given Create and edit Sites on the Permissions page.

  • Recorded with the SWMS at approval: While a SWMS is a draft, it shows the site’s current details and emergency information. When it’s approved, those details are recorded with that version, so changing the site later never changes what an approved SWMS or its PDF says. The PDF’s document control block shows the date the site details were recorded. If the site has changed since, the SWMS shows Site details changed since this version was approved and lists what changed. Tap Create new version to bring the new details in: the new version shows them until it’s approved, and then records them in turn. A SWMS approved before this feature shows the site’s current details, with a note saying so.

  • Nearest Hospital Auto-Resolution: If a nearest hospital hasn’t been manually specified in the site’s emergency settings, the system will attempt to automatically resolve and display the nearest hospital based on the site’s address.

  • Confined Space Rescue Plans: If your SWMS includes the Confined Space Entry High Risk Construction Work (HRCW) category, the system checks whether a valid Emergency Management Plan exists for the site. If one is missing, a warning banner will appear to remind you that a Rescue Plan is legally required before work can commence.

If something you do on a SWMS doesn’t go through (saving, submitting for review, approving, archiving or creating a new version), a message appears at the bottom of the screen. The first line says what went wrong, when we know. The second line says what didn’t happen and what to do next, for example “Your changes weren’t saved. Check for missing required sections and try again.”

  • Your changes stay on screen, so you can fix the problem and try again without retyping.
  • Saving a draft doesn’t check whether the SWMS is complete, so a missing section never stops a save. When you submit for review and required sections are missing, a box at the top of the editor lists each one with a Go to link to its section. Fix them, then submit again. The same box lists anything the review check flagged.
  • If controls are missing their More control details, the box says how many. Its Go to the first control to fix link opens that work step, opens the control’s details and puts your cursor in the first empty field.
  • A SWMS isn’t sent for review while its latest changes can’t be saved, so what the reviewer sees always matches what’s on your screen.
  • If it keeps happening, check your connection, then try again in a minute.